Case study |
Commercial
Whitehaven Academy
Location
Whitehaven, Cumbria
works completed
Remove and replace all existing windows and frames
Details
Leesfield was contracted to remove and replace all existing windows and frames and replace them with brand new thermal efficient windows.
Whitehaven Academy was built in the early 1980s and has only received minor work to the building over the years. Leesfield was contracted to remove and replace all existing windows and frames and replace them with brand new thermal efficient windows. Making the school kinder to the environment and ensuring that the building was retaining the heat it was producing.
To ensure that the windows could be replaced efficiently and safely, Leesfield worked with Whitehaven Academy to develop a phased plan to suit the Academy’s needs. The new windows and frames were a necessary requirement to develop the exterior of the Academy and ensure all pupils’ safety.
Energy efficient glazing ensure that the Academy is warmer and quieter as well as reducing energy bills. The new windows create a lighter, brighter and more friendly atmosphere.
Leesfield are still completing the entire project through an agreed ongoing contract to ensure minimum disruption to the running of Whitehaven Academy.